Location
Islington, London
Sector
Commercial
Timeline
18 months
Core Technologies
Project Overview
Major security infrastructure installation including IP access control, destination control lift integration, speedgates, building lockdown capability, building-wide CCTV, WAN monitoring and perimeter detection.
Systems Installed
- IP access control
- OTIS Lift integration
- Bespoke IDL speedgates
- Building lockdown for bomb/terror threat
- IP/Analogue CCTV
- CCTV monitoring via WAN
- IP Entryphone
- Perimeter detection
Project Highlights
- 260,000 sq ft of high-specification office space, one of AHMM's landmark reinvention projects
- Shortlisted for the RIBA Stirling Prize, the UK's most prestigious architecture award
- Security integration spanning IP access control, destination control lift integration with OTIS, bespoke IDL speedgates and building lockdown capability
- Full perimeter detection linked to CCTV and access control systems with WAN-based remote monitoring
- Major Derwent London asset in the heart of Islington's thriving tech and creative corridor
Project Team
- Client: Derwent London
- Main Contractor: BAM Construction
- Architect: AHMM
- Structural Engineer: AKT II
Technology Partners
Delivered with systems from: