Location
London
Sector
Commercial (Co-working)
Timeline
4 months
Core Technologies
Project Overview
Integrated security installation including cloud-hosted access control with wireless and hard-wired locks, building lockdown facility, lift integration, IP CCTV, thermal imaging, bespoke DDA entryphone panels and intruder alarm system.
Systems Installed
- Access Control: Aperio Abloy Custom Access System
- CCTV: CCTV System (brand not to be disclosed)
- Intruder Alarm: Alarm system linked with 42 Berners Street
- Lift Integration: Low-level lift integration
- Building Lockdown Facility
- IP CCTV
- Thermal Imaging
- Bespoke DDA Entryphone panels
Project Highlights
- Architecturally iconic building
- Linked alarm system with 42 Berners Street, multi-site integration
- Low-level lift integration
Project Team
- Architect / Designer: Design with Narrative (DWN) & Modus Space
- Architect (Building): Ben Adams Architects
- Project Manager: Blackburn & Co
Project Gallery